Reclaim 210 Minutes of Production Every Week by Cleaning 65% Faster.

Clean your machine in just 4 mins 58 seconds. Choose between the full technical demo and/or the high-speed highlights if you're in a rush! Clean your machine in just 4 mins 58 seconds. Choose between the full technical demo and/or the high-speed highlights if you're in a rush!  

A. The Full Technical Proof: 4m 58s to a Clean Machine 

This is the unedited, step-by-step cleaning sequence. Watch the clock—this is how you kill labor costs and hit your daily production targets early. 

B. In a Rush? Watch the Highlights    

Get the high-speed highlights here to see exactly what makes this 4-minute, 58-second cleaning turnaround possible!                                                           

Process standard machine tomra 4c
Cleaning Time 15 Minutes (3x daily) 5 Minutes (3x daily)
Total Daily Downtime 45 Minutes 15 Minutes
Daily Labor Saved - + 30 Minutes
Total Weekly Labor Saved  - + 210 Minutes

Stop Paying for Downtime 

Labor costs are too high to spend 45 minutes a day on cleaning! 

The Result:

You get over three hours of extra throughput every week WITHOUT adding a single person to your crew. It’s the fastest way to lower your cost-per-pound and hit your daily targets earlier. 

Ready to eliminate your labor bottlenecks? 

See how this high-speed line slashes your cleaning downtime and integrates into your existing facility to maximize your daily yield.